Salt Cavern Energy Storage Industrial Base Project
[Industries Including]
Energy
[Project Plan]
The construction site of the project is located in Feicheng Economic Development Zone, with a total planned investment of RMB 15.8 billion Yuan. The project is divided into two phases. The first phase is to build a salt cavern energy storage and peak shaving power station, with a total planned installed capacity of 1250 MW, covering an area of 1,050 Mu, and 10 standard salt cavern cavities with a total capacity of 4.2 million cubic meters. The second phase is to build a natural gas storage, an underground gas storage, with a storage capacity of 200 million cubic meters and a workload of 120 million cubic meters, with a daily gas supply of 6 million cubic meters.
[Contact]
Note: Please note the project number in the letter.